EasyManua.ls Logo

Conair 100 - On the Throat; Po S I T I O N I N G T H E D R y E R O N T H E F L O O R; M O U N T I N G T H E H O P P E R O N T H E T H R O a T

Conair 100
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Positioning the Dryer on the Floor;
Mounting the Hopper on the Throat
WARNING: You are responsible for the structural integrity of this installation.
We recommend that you:
Use bolts no smaller than 3/8 in. (M 10) to mount the hopper on the throat of
a processing machine.
The hopper bolts to the throat of the processing machine, as pictured above.
The dryer can be positioned on the floor near the processing machine.
3-8 l Installation
Tools for installation:
9/16 wrench
Flathead screwdriver
Hoist

Table of Contents

Related product manuals