Testing The Installation(continued)
4 Press the START button.
If everything is installed correctly:
The green light on the start button will illuminate.
The process and regeneration blowers turn on.
The process and regeneration heaters turn on.
If the desiccant tanks are not in their correct position, the carousel will
turn clockwise and stop in the correct position.
5 Press the STOP button.
If everything is installed correctly:
The blowers will continue running as needed to cool the heaters.
6 The test is over. If the dryer performed the normal operating sequences as out-
lined, you can load the hopper and begin operation. If it did not, refer to the
T
ROUBLESHOOTING
section of the User Guide.