EasyManua.ls Logo

Conair 100 - Page 98

Conair 100
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B-2 l Appendix
Mounting the Dryer and Hopper on
a Mobile Floor Stand
CAUTION:
To prevent accident and injury, lift the empty hopper and the dryer onto
the mobile floor stand using a hoist and the lifting lugs provided.
1 Lift the hopper onto the mobile floor stand using a hoist and the lifting lugs
provided. Make sure you align the bolt holes in the mobile floor stand with the
bolt holes on the discharge assembly.
(continued)
Tools for installation:
5/32 Allen wrench
3/8 and 9/16 wrench
Phillips screwdriver
Flathead screwdriver
Hoist and strap

Table of Contents

Related product manuals