14
2 Install VTO
Unit VTO on-site installation includes: wall embedded installation, door embedded
installation (with box/without box), standalone installation.
This chapter will introduce installation of VTO1220A/VTO1210A-X series,
VTO1210B(W)-X/VTO1220B(W) series and VTO1210C-X series.
2.1 VTO1220A/VTO1210A-X
2.1.1 Screw
ST3×18 Cross recessed pan head
tapping screws –white alloy
M3×16 Cross slot recessed pan head
screws- zinc black
White expansion pipe ¢6×30mm
2.1.2 Installation Steps
Step 1. Fix metal housing on wall with screw a.
Step 2. Fix device on the metal housing with screw b.