EasyManua.ls Logo

Daikin BRC2E52C - Program Dry Operation

Daikin BRC2E52C
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRC2E52C7 / BRC3E52C7 Operation manual
4P368042-1 - 2014.02
16
Basic Operation Method
Program Dry Operation
Preparation
For mechanical protection purposes, turn ON the air conditioner at least 6 hours before
starting the operation of the air conditioner.
Do not turn OFF the air conditioner in season in order to ensure the smooth starting of the air
conditioner.
The dry mode may not be selected if the remote controller has no eligibility to select cooling/
heating mode (See "Setting the Cooling/Heating Selection Eligibility" on page 19 for
details).
1
Press the Operation Mode Selector button several
times until Dry mode is selected.
Note
Dry mode may not be available depending on the type of indoor
unit.
2
Press the ON/OFF button.
The Operation lamp will be lit and the air
conditioner will start operating.
Note
The air conditioner is in automatic temperature and fan speed
control. Therefore, the temperature or fan speed cannot be
changed while the air conditioner is in operation.
3
To set the airow direction, see "Airow Direction" on page 28.
4
When the ON/OFF button is pressed again, the air
conditioner will stop operating and the Operation
lamp will turn OFF.
Note
To prevent water leakage or system failure, do not turn OFF the
power soon after the air conditioner stops operating. Be sure to
wait at least 5 minutes so that the drain pump nishes discharging
the residual water from the indoor unit.
Operation Method

Related product manuals