EasyManua.ls Logo

Daikin FTXS30HVJU - Removal of the Electrical Box

Daikin FTXS30HVJU
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiUS04-924 Outdoor Unit
166 Removal Procedure
2.2 Removal of the Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembly work.
Step Procedure Points
1 Remove the fixing screw
from the shut-off valve
mounting plate.
2 Remove the fixing screw
on the partition plate.
3 Remove the 2 screws to
detach the ground wires.
(R9617)
(R9618)
Partition plate
(R9619)
Earth wire

Table of Contents

Other manuals for Daikin FTXS30HVJU

Related product manuals