EasyManua.ls Logo

Daikin FVXM50A2V1B - Before operation; System preparation steps

Daikin FVXM50A2V1B
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 | Before operation
User reference guide
17
CVXM20+FVXM25~50A2V1B
Split system air conditioners
4P625990-1A – 2020.10
5 Before operation
5.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Turning on the power supply.
Inserting the batteries in the user interface.
Setting the clock.
Setting the brightness of the Daikin eye lamp.
Mounting the user interface holder to the wall or another surface.
5.2 To turn on the power supply
1 Turn the circuit breaker on.
5.3 To insert the batteries
The batteries will last for about 1 year.
1 Remove the front cover.
2 Insert both batteries at once.
3 Put back the front cover.
2
3
1
AAA.LR03
INFORMATION
Low energy of battery is indicated by icon on the LCD display.
ALWAYS replace both batteries together.

Table of Contents

Other manuals for Daikin FVXM50A2V1B

Related product manuals