Figure 2 Upper Hole for Spring-Loaded Hinge
Figure 3 Lower Fixed Pin Hinge
Rear Panel
Remove screws from rear panel to remove rear panel.
Moving Unit into Final Location
Move the unit in its upright position to the installation site using a forklift or pallet jack. It is
recommended that the unit be protected from damage to the decorative doors during any
storage or moving.
The shipping skid should be left in place if the unit is being moved with a forklift. If the unit is
being lifted, use spreader bars to prevent damage to the doors and panels. The unit shipping
skid as 3/4” holes in the shipping skid to which casters with 3/4” stems can be attached. This
allows easy movement down halls, into elevators and through doorways. Improper lifting or
moving of equipment may result in damage to decorative doors, panels or frame members.
When rigging, make sure all wiring and tube connections are protected to prevent any
damage.
Keep tines of the forklift level and at a height suitable to fit below the skid and/or unit to prevent
exterior and/or underside damage. Make sure the forks are spread to their widest allowable
width for proper balance. Do not lift the unit any higher than 4 inches (100mm) off the ground.