Dectron, Inc. March 2012
DSH/DSV/RSH/DBH/RBH Series Dehumidifier Owner’s Manual
Building Construction Component Overview
Data subject to change without notice.
22
BUILDING
CONSTRUCTION
DECTRON
Building construction must accommodate the arrangements below.
1
4
6
3
5
7
2
8
8
9
10
11
13
14
15
16
17
18
19
CONTACT FACTORY IF
THE PUMP OPERATES
ON A TIMER
FILTER
ELECTRICAL PANEL
DANGER HIGH VOLTAGE
OPTIONAL AIR CONDITIONING
A) AIR-COOLED (SHOWN)
B) WATER-COOLED (NOT SHOWN)
C) HEAT PUMP LOOP (NOT SHOWN)
D) FLUID COOLER WITH PUMP KIT (NOT SHOWN)
Outdoor Air
elbow (with
turning vanes)
or other flow
interruption
Return Air
LIQUID
HOT GAS
12
Straight at least
5 X duct width
Straight at least
2.5 X duct width
Supply Air
Never install
chemical
feeder here.
Cable to remote condenser
Sample
Actual appearance
may vary.
Connect pump intake
to bottom of main pipe
to reduce bubbles in
the DRY-O-TRON
®
circulation loop.
Do not exceed maximum tube length shown on
nameplate.
Hot gas risers must have P-traps at least every
20 ft of vertical rise.
For salt-water pools, see
piping details under
Piping - Pool Water, on
subsequent page.