EasyManua.ls Logo

DeDietrich MCA 45 - Page 40

DeDietrich MCA 45
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Open the bleed connection using the bleed key provided whilst
keeping a rag pressed against the connection.
8. Wait until water comes out of the bleed valve and then close the
bleed connection.
CAUTION
The water may still be hot.
9. Switch on the boiler. A vent cycle of a duration of around 3 minutes
is carried out automatically.
10.After venting, check whether the pressure in the installation is still
sufficient.
If the water pressure is lower than 0,8 bar, more water
should be added. If necessary, top up the water level in the
heating system (recommended hydraulic pressure
between 1,5 and 2,0 bar).
¼
See chapter: "Filling the system", page 35
11.Set the heating set point.
T000217-A
T000218-A
6. Checking and maintenance MCA 45 - 65 - 90 - 115
39
06/09/2010 - 300024828-001-A

Table of Contents

Other manuals for DeDietrich MCA 45

Related product manuals