EasyManua.ls Logo

Dell EMC Z9264F-ON - Ground Lug Assembly

Dell EMC Z9264F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Carefully remove the switch from the container and place it on a secure and clean surface.
4 Remove all packing material.
5 Inspect the product and accessories for damage.
Ground lug assembly
Before you install the switch into a rack, install the ground (GND) lug assembly.
NOTE: For AC-powered switches, although the third conductor of the AC power cable provides a ground path, Dell EMC
recommends grounding your switch with a dedicated ground wire.
NOTE: For a DC-powered switch, the only way to safely ground your switch is to attach a dedicated ground wire. The ground lug
kit ships in a plastic bag that is placed with the other accessories inside the shipping box. The ground lug bracket screws ship
attached to the switch. Before you install the DC switch in the dual-tray, attach the ground lug and bracket to the switch using
the included screws and then attach the DC ground wire to the ground lug.
The switch includes two installed M4 screws on the lower-left side of your switch. The DC switch also includes an assembled UL-certied
GND lug with bracket, which is packaged separately. The AC switch does not include the UL-certied GND lug. If any parts are missing,
contact your Dell EMC sales representative.
The ground cable is not included. To properly ground the switch, Dell EMC recommends a one- or two-hole lug, M4 hole size. The
grounding lugs must be a UL-recognized, crimp-type lug.
CAUTION: Grounding conductors
must
be made of copper. Do not use aluminum conductors.
NOTE: Coat the ground lug assembly with an anti-oxidant compound before crimping. Also, bring any unplated mating surfaces
to a clean nish and coat with an anti-oxidant before mating. Plated mating surfaces must be clean and free from contamination.
1 Remove the two installed M4 screws from the lower-left side of your switch.
NOTE
: Keep these screws.
2 Remove the bracket assembly from the shipping bag.
Figure 9. Ground lug assembly
3 Measure and cut a length of ground wire sucient to reach between the system-installed ground lug assembly and your rack ground
point.
4 Crimp the ground cable to the ground lug assembly.
a Coat the bare end of the wire with an anti-oxidant compound.
b Insert the end of the wire into the ground lug.
c Crimp the ground lug end.
5 Clean the bracket and lug surfaces thoroughly, and apply an anti-oxidant solution to the mating surfaces.
6 Attach the switch ground lug assembly to the switch.
20
Z9264F-ON switch installation

Table of Contents

Other manuals for Dell EMC Z9264F-ON

Related product manuals