EasyManua.ls Logo

Dell EMC Z9264F-ON - After Switch Placement

Dell EMC Z9264F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
For more information, see Unpack.
6 Conrm that the software version of the replacement switch is the same as the previously installed switch.
show os-version
If the software versions do not match, upgrade the replacement switch software using the procedure included with the rmware
download.
7 Copy the backed-up switch conguration to the new switch.
copy tftp://hostip/filepath running-config
8 Install the new switch in your rack or cabinet.
For detailed installation instructions, see Z9264F-ON switch installation.
If you are using the fan trays or PSUs from the removed switch, reinsert them in the replacement switch.
9 Connect all the cables.
10 Power on the switch.
For more information, see Switch power-up.
After switch placement
After you have securely installed and powered on the Z9264F-ON switch:
If you are using Dell EMC software, see switch documentation at www.dell.com/support.
If you need ONIE information, see ONIE documentation at www.onie.org.
If you are using third-party software, see your third-party documentation.
Z9264F-ON switch installation
27

Table of Contents

Other manuals for Dell EMC Z9264F-ON

Related product manuals