EasyManua.ls Logo

Dell EMC Z9264F-ON - Optics Handling

Dell EMC Z9264F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 14. Front rack installation
NOTE
: Do not the use the mounted rack rails as a shelf or a workplace.
3 Tighten the two thumbscrews and rack screws.
To remove the switch from the rack or cabinet, press in the two side-release bars on the switch simultaneously and slide the switch
forward.
Optics installation
The Z9264F-ON switch has QSFP28 and SFP+ optical ports.
For a list of supported optics, see the specication sheets at www.dell.com/support or contact your Dell EMC Sales representative.
CAUTION
: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the Z9264F-ON switch and components.
WARNING: When working with optical bers, follow all warning labels and always wear eye protection. Never look directly into
the end of a terminated or unterminated ber or connector as it may cause eye damage.
1 Position the optic to enter the port correctly.
The optic has a key that prevents it from being inserted incorrectly.
2 Insert the optic into the port until it gently snaps into place.
NOTE
: When you cable the ports, be sure not to interfere with the airow from the small vent holes above and below the
ports.
Z9264F-ON switch installation 25

Table of Contents

Other manuals for Dell EMC Z9264F-ON

Related product manuals