EasyManua.ls Logo

Dell EMC Z9264F-ON - 2 RU Front-Rack Installation

Dell EMC Z9264F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 13. Z9264F-ON installation
1
Extra screws to restrict front-back movement of the switch. 2 Main screw
2RU front-rack installation
Congure the rails that are attached to the switch.
NOTE
: For more instructions, see the installation instruction labels on the rail.
1 Attach the inner switch rails to the Z9264F-ON switch.
Line up the rail with the mounting heads and attach the rail to the switch.
Slide the rail back until it locks into place.
2 Line up both switch rails to the previously mounted rack rails and slide the switch in until it is ush with front of rack.
To keep the switch from inadvertently sliding out of the rack and falling, about 3 inches before you fully insert your switch, the rail
locking feature engages.
24
Z9264F-ON switch installation

Table of Contents

Other manuals for Dell EMC Z9264F-ON

Related product manuals