EasyManua.ls Logo

Dell EMC Z9264F-ON - Four-post Rack Assembly

Dell EMC Z9264F-ON
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 10. Ground lug assembly attached
7 Attach the GND lug bracket assembly to your switch using the two removed screws, as shown.
Torque the M4 screws to ±8–10 in-lbs.
Figure 11. Ground lug assembly attached
8 Attach the other end of the ground wire to your rack ground point.
9 Install your switch into your rack using the Z9264F-ON switch installation.
Four-post rack assembly
Due to the chassis weight, the Z9264F-ON switch does not support a two-post rack installation; you must install the switch in a four-post
rack.
To install in a four-post rack, follow the instructions in your rack frame kit. In a four-post rack, the maximum distance between the front and
back vertical posts is 36 inches (91.44 cm); the minimum distance is 24 inches (60.96 cm).
Z9264F-ON switch installation
21

Table of Contents

Other manuals for Dell EMC Z9264F-ON

Related product manuals