3
Site Location and Preparation
The S4820T is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
Network telecommunication facilities
Data centers
Other locations where the National Electric Code (NEC) applies
This chapter contains the following sections regarding where and how the S4820T should be installed:
Site Selection
Cabinet Placement
Rack Mounting
Grounding
Fans and Airflow
Power
Storing Components
NOTE: Install the S4820T system into a rack or cabinet before installing any optional components.