Installation
13
Unpacking Steps
NOTE:
Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
1
Place the container on a clean, flat surface and cut all straps securing the
container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure
and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
Rack Mounting the Switch
You may either place the switch on the rack shelf or mount the switch directly
into a 19" wide, EIA-310-E compliant rack (four-post, two-post, or threaded
methods). The Dell ReadyRails™ system is provided for 1U front-rack, and
two-post installations. The ReadyRails system includes two separately
packaged rail assemblies and two rails that are shipped attached to the sides
of the switch.
WARNING:
This is a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory information booklet before you begin.
NOTE:
The illustrations in this document are not intended to represent a specific
switch.

Table of Contents

Other manuals for Dell Networking N4000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Networking N4000 Series and is the answer not in the manual?

Dell Networking N4000 Series Specifications

General IconGeneral
LayerLayer 3
Switching CapacityUp to 1.28 Tbps
Operating Temperature0°C to 45°C (32°F to 113°F)
Storage Temperature-40°C to 70°C (-40°F to 158°F)
SeriesN4000 Series
StackingUp to 12 units
Power SupplyDual, hot-swappable
ManagementWeb, CLI, SNMP
Humidity10% to 90% (non-condensing)

Related product manuals