Dell Networking N4000 Series Getting Started Guide

Dell Networking N4000 Series
378 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
16
Installation
Two-post Flush-mount Configuration
1
For this configuration, the castings must be removed from the front side of
each ReadyRails assembly. See
Figure 4, item 1 on page 16. Use a Torx™
driver to remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting. Retain the castings for future
rack requirements. It is not necessary to remove the rear flange castings.
Figure 4. Two-post Flush-mount Configuration
2
Attach one rail to the front post flange with two user-supplied screws.
See Figure 4, item 2.

Table of Contents

Other manuals for Dell Networking N4000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Networking N4000 Series and is the answer not in the manual?

Dell Networking N4000 Series Specifications

General IconGeneral
LayerLayer 3
Switching CapacityUp to 1.28 Tbps
Operating Temperature0°C to 45°C (32°F to 113°F)
Storage Temperature-40°C to 70°C (-40°F to 158°F)
SeriesN4000 Series
StackingUp to 12 units
Power SupplyDual, hot-swappable
ManagementWeb, CLI, SNMP
Humidity10% to 90% (non-condensing)