Installation
19
1U Front-rack Installation
The rails that are attached to the switch must be configured.
1
Attach the switch rails (inner chassis members) to the N4000 switch.
Figure 7, item 1 shows the detail for the front standoff with locking tab.
Figure 7. Attaching the Switch Rails
2
After both switch rails are installed, line them up on Ready-Rails previously
mounted to the rack and slide the switch in until flush with front of rack.
About 3inches prior to full insertion, the rail locking feature will engage to
keep the switch from inadvertently sliding out of the rack and falling.

Table of Contents

Other manuals for Dell Networking N4000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Networking N4000 Series and is the answer not in the manual?

Dell Networking N4000 Series Specifications

General IconGeneral
LayerLayer 3
Switching CapacityUp to 1.28 Tbps
Operating Temperature0°C to 45°C (32°F to 113°F)
Storage Temperature-40°C to 70°C (-40°F to 158°F)
SeriesN4000 Series
StackingUp to 12 units
Power SupplyDual, hot-swappable
ManagementWeb, CLI, SNMP
Humidity10% to 90% (non-condensing)

Related product manuals