EasyManua.ls Logo

Dell Networking S4048 - Two-Post Center-Mount Configuration

Dell Networking S4048
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 7. Two-post ush-mount conguration
2 Attach one rail to the front post ange with two user-supplied screws, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post ange with two user-supplied
screws. Refer to item 3.
4 Repeat this procedure for the second rail.
Two-post center-mount conguration
CAUTION
: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post ange with two user-supplied
screws, item 1.
S4048–ON installation
19

Table of Contents

Related product manuals