EasyManua.ls Logo

Dell S4810 - Supply Power and Power up the System

Dell S4810
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the S4810 | 29
Figure 4-4. Three S4810s Connected in a Ring
Supply Power and Power Up the System
Supply power to the S4810 after it is mounted in a rack or cabinet.
Dell Force10 recommends re-inspecting your system prior to powering up. Verify that:
the equipment is properly secured to the rack and properly grounded.
the equipment rack is properly mounted and grounded.
the ambient temperature around the unit (which may be higher than the room temperature) is within the
limits specified for the S4810.
there is sufficient airflow around the unit.
the input circuits are correctly sized for the loads and that you use sufficient over-current protection
devices.
all protective covers are in place.
blank panels are installed if you do not install optional modules.
. NOTE: A US AC power cable is included for powering up an AC power supply. You must order all other
power cables separately.
. WARNING: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or
heel ground strap when handling the S4810 and its components.
52 60
52 60
52 60
48 56
48 56
48 56
Chassis 3
Chassis 2
Chassis 1

Table of Contents

Other manuals for Dell S4810

Related product manuals