INSTALLATION
3-10 15 Jun 12
HyperPoolShaker
Feeder Connection (Cont’d)
Figure 3-9. Feed Pipe Targets
Collection Pan Bypass
The collection pan outlet discharges directly into the feeder. An 8” (203mm) bypass outlet is
provided on the underside of the collection pan to divert the feed, if necessary. A Victaulic
®
cap
and coupling is used to close the bypass opening. To use the bypass, remove the cap and
connect an 8” Victaulic
®
groove pipe to the outlet.
Discharge Duct Connection
The hopper has a rectangular drainage cutout (Figure 3-10) on each side. As shipped, one cutout
is closed with a removable panel bolted to the hopper. The panel should be installed on the
unneeded drainage cutout and sealed with an appropriate waterproof sealant to prevent leakage.
Connect a discharge duct to fit the cutout on the opposite side of the hopper using the four bolts
provided to secure the duct flange to the hopper.
Figure 3-10. Hopper Discharge Cutout
ELECTRIC POWER CONNECTIONS
Remove the cover from the input power box, and connect the facility electrical power supply to the
junction box in accordance with Figure 3-11 and wiring schematic in Section 8.
The vibrator motors are three-phase, 50 or 60Hz motor. The motors are not dual wound and
must be operated at the design voltage. For motor power requirements, refer to the label on the
motor data plate.