MAINTENANCE
5-4 15 Jun 12
HyperPoolShaker
SCREEN FRAME (CONT’D)
Figure 5-1. Screen Frame Inspection and Maintenance
SCREEN PANEL REPLACEMENT
Use the following procedure when changing screen panels. If installing panels for the first time,
follow only the instructions under Installation. Screen panel replacement is done with the installer
on the compression side of the screen frame.
Removal
1. Stop the flow of feed slurry to the feeder and desander/desilter.
2. Wash screen panel to remove residue from panel surfaces.
3. De-energize vibrator motors, and lock out and tag out electric power.
HP-704 screen bed. Note compression pins and panel locators.
4. Remove compression handle from holder, and insert into handle tube of compression
assembly.