SGX VIBRATOR MOTOR
7-8 15 Jun 12
HyperPoolShaker
Motor Positioning and Mounting
1 - Using overhead lifting device, position
vibrator motor over screen frame.
2 - Position motor on screen frame and align
mounting holes with screen frame. Insert
bolts (without anti-seize compound
applied) with hardened washers through
motor holes from underside of screen
frame. Install hardened washers and Flex-
Loc nuts on top.
3 - Tighten bolts to 300 ft lbs.