EasyManua.ls Logo

DGSHAPE DWX-53DC - Preparation to Use the Machine; Check before Operation

DGSHAPE DWX-53DC
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre-
installation
check
12
Insta
llatio
n
Important
The machine cannot be machined without a dust collector.
Warning
Be sure to operate the dust collector.
Machining scraps and workpieces may ignite/cause injury to personnel.
Warning
Do not use a vacuum cleaner to vacuum off any machining scraps.
Use of an ordinary vacuum cleaner to breathe fine particles may cause a fire or explosion.
Check before operation
Dust collector
Since this machine cuts materials, machining scraps are produced during machining. A separate dust
collector must be provided. Insert the dust collector hose into the dust collector pipe of the machine and
use it.
Prepare a dust collector that meets the following conditions.
Static pressure: 26 kPa or more
4
/min Above
Dust collecting hose [A] which fills the inner or
outer diameter of the dust collecting pipe
When a dust collecting hose () is put on the outside
of the dust collecting pipe (): Inner diameter of the
dust collecting hose: 50.8 mm
[B]
When inserting the dust collecting hose () inside
the dust collecting pipe (): Outer diameter of the
dust collecting hose: 45.6 mm

Related product manuals