EasyManua.ls Logo

Dormakaba ED - Commissioning; Maintenance

Dormakaba ED
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning Assembly Instruction
12 ED UPS 060675 45532/17224 - 07/2023
5.3 Cable routing
Lay the connection cables as follows:
Illustrated without ribbon cable
Connection cable: Battery - ED-AMP board
Connection cable: Board - program switch
Illustrated with ribbon cable
6 Commissioning
No further steps are required for commissioning.
7 Maintenance
Activity Interval
Function test of swing door operator without mains voltage Annually
Check the physical integrity of the battery Annually
Preventive replacement of the battery after a certain period of time is not
required.

Related product manuals