Commissioning Assembly Instruction
12 ED UPS 060675 45532/17224 - 07/2023
5.3 Cable routing
Lay the connection cables as follows:
Illustrated without ribbon cable
Connection cable: Battery - ED-AMP board
Connection cable: Board - program switch
Illustrated with ribbon cable
6 Commissioning
No further steps are required for commissioning.
7 Maintenance
Activity Interval
Function test of swing door operator without mains voltage Annually
Check the physical integrity of the battery Annually
Preventive replacement of the battery after a certain period of time is not
required.