EasyManua.ls Logo

Dover HEIL DuraPack Python - Page 90

Dover HEIL DuraPack Python
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issued July 2024
Maintenance and Adjustment
Copyright 2024, The Heil Co.
Printed in the U.S.A.
Maintenance and Adjustment
84
BODY PREVENTIVE MAINTENANCE CHART
*HOURS OF OPERATION
COMPONENT/SYSTEM
8
40
200
1000
2000
CHECK/SERVICE
to female pilot of PTO pump flange.
Failure to lubricate female pilot of PTO
as given may cause damage to the
pump shaft. Greasing is NOT required
on wet spline PTOs such as the
Chelsea 890/897 series.
Grease Fittings
Lubricate as shown on Body Lube
Chart.
Body Undercoating
Inspect body undercoating and repair
as necessary.
Tailgate Seal Integrity
Packer/Ejector Cylinder Preventive
Maintenance
See Packer/Ejector Cylinder
Preventive Maintenance .
Packer/Ejector Panel Bolt-in
Cylinder Mount Bolts
Check for tightness. Bolt torques
should be 192 Ft-Lbs. (lubricated
threads)
PTO/Transmission Interface
Inspection
Check the torque on the PTO mounting
screws and tighten to the proper torque
specification
* Daily = 8 hrs. Weekly = 40 hrs. Monthly = 200 hrs. 6 Months = 1000 hrs. Yearly = 2000 hrs.
87

Table of Contents