EasyManua.ls Logo

Dräger Atlan A350 XL - Checklist in the Walk-Through Mode

Dräger Atlan A350 XL
332 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
136 Instructions for use | Atlan A300, A300 XL, A350, A350 XL SW 1.0n
Tests
8.4 Checklist in the walk-through mode
This section describes how the checklist is processed, using as an example a
device with an electronically controlled gas mixer, active AGS, O
2 sensor, and
factory defaults.
The scope of the checklist and the test steps displayed may vary due to differing
system settings.
The instructions on the screen take precedence.
Prerequisites
1. Connect the hoses (1).
2. Seal the Y-piece (2).
3. Set the APL valve to 30.
4. Close the flow control valve.
351023510035103
2
1
20 40
30

Table of Contents

Related product manuals