EasyManua.ls Logo

Dräger Primus - Page 37

Dräger Primus
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Getting
started
Breathing
system
@
Complete
and
engaged,
hoses
firmly
plugged
in.
@
Insert
optional
filters.
@
Fresh
soda
lime,
without
violet
discoloration.
T
Drain
any
water
which
may
have
collected
in
the
ventilator
diaphragm.
Correct
operation
of
the
workstation
will
be
impaired
by
=
condensation
flowing
back
into
the
breathing
system
and
ventilator
diaphragm.
@
install
water
traps
in
the
hoses.
Care
must
be
taken
when
connecting
the
patient.
| |
EN
Risk
of
strangulation!
AGS
anaesthetic
gas
scavenging
system
1
The
transfer
hose
from
the
waste
gas
port
must
be
connected.
2
The
scavenging
hose
must
be
connected,
the
anaesthetic
waste
gas
probe
must
be
plugged
into
the
Drager
wall
socket
and
the
indicator
must
be
green.
3
The
float
must
be
between
the
two
marks.
instructions
for
Use
Primus
SW
2.n
37
uni
0018
uni
0018

Other manuals for Dräger Primus

Related product manuals