SUPERSTRUCTURE SECTION 13
Page 7
DRESSTA TD-25M EXTRA
1. Check the ROPS structure and cab for cracks.
2. Check and complete the lacking insulation’s elements of cab and pod.
3. Check and replace if necessary rubber shock absorber of the pod.
4. Inspect the electrical harness for damage and repair if necessary.
5. Inspect, repair or replace all control system elements (links, cables, springs, levers and
connections) if damaged.
6. POD REASSEMBLY
1. Reassembly
rubber shock absorber (1, Fig. 13.8) and plates (2) with bolt and nut (7) to the front
(8) and rear (9) brackets of pod.
2. Raise the pod and carefully put on the brackets.
3. Install plate (3, Fig. 13.8) and bolts (4). Assemble cover plate (5) with bolt (6).
4. Install master switch (3, Fig. 13.6) with cables, torque nut to 51 [Nm]. Reconnect negative (-)
cable to the battery. Torque nut to 31 [Nm].
5. Lift up air conditioner heater assy (8), reassemble mounting hardware (9) and air conditioner
hoses (10). Reassemble A/C heater compartment cover.
6. Reinstall the frame with the hoses on the bottom of console. Reinstall the hoses
(2, 3 and 4, Fig. 13.5) to the drive train control valve.
7. Reinstall the hoses (6) to pilot lock valve (5) and switching valve (7).
8. Reinstall wire harness plugs to the sockets (1, Fig. 13.7).
9. Reinstall one wire harness socket in the platform hole, torque the nuts to 0.7 [Nm].
Reconnect wire harness plugs (2). Reconnect electrical connectors for two cables (4) of the
instrument panel supply. Install the plate.
10. Reconnect wire harness plug (4, Fig. 13.4) of the engine control potentiometer.
11. Reinstall brake control cable to the bracket under pod. Reconnect brake control cable (3).
12. Pull the horn push button (6, Fig. 13.6) up.
13. Pull the valves up. Install the bolts securing the blade control pilot valve (5) and ripper
control pilot valve (7) to the mounting plate. Install R.H. console cover (4, Fig. 13.6).
14. Install the operator’s seat.
7. CAB REASSEMBLY
1. Attach the hoist to the cab lifting points (2, Fig. 13.3), position the cab on the platform. Install
bolts (1) (on both sides of the cab) and hand tighten. Turn back the threaded sleeve (6) at
mounting points (3), so there is no contact with the platform surface. Torque bolts (1)
to 80 [Nm] at both sides of the cab.
2. Screw in threaded sleeve (6) until it comes to contact with the pod surface. Install the bolts with
washers (3) and torque to 80 [Nm]. Check the seal gasket (5) between the cab (4) and pod (7)
for defects in spots where dust could penetrate inside the cab.