Leaders in Pipeline Survey Systems
OPERATOR’S MANUAL
Issue 4.04 - 1207 2
Equipment Serial Number:
Dynalog Job/Contract Number:
OPERATING INSTRUCTIONS
Part 1 – OPERATION
1. INTRODUCTION
This folder includes full instructions and data for unpacking, setting-up, commissioning, and operating the
above referenced C-Scan Model 2010 Survey & Monitoring System for buried pipelines. Part 1 of the
Manual – OPERATION – is divided into Sections as shown on the Contents List on the next page. Part 2
is the Survey procedure manual supplied as a separate document.
Before any setting-up and survey work is undertaken, these instructions must be read and fully
understood by the Operators who will carry out the survey work using this equipment.
Issue 4-04 - 1207
Dynalog Electronics Limited
PO Box 1073 Bristol BS99 1HF United Kingdom
e-mail: enquiry@dynalog.co.uk
Website: www.dynalog.co.uk
United Kingdom Health & Safety at Work Act 1974
Section 6 (a) of this Act requires manufacturers to advise their customers
on the safety and handling precautions to be observed when installing, operating,
maintaining and servicing their products.
The user’s attention is therefore drawn to the following:
1. The appropriate sections of this manual must be read carefully before using the equipment.
2. Operation and maintenance must only be carried out by suitably trained personnel.
3. Normal safety precautions must be taken and appropriate procedures observed to avoid accidents
Refer to the equipment suppliers — name and address below — for any technical advice or product
information