C 10 2
2 Transportation on low-bed trailers
m
Reduce the paver finisher and the screed to their basic widths; also remove any at-
tached side plates. The maximum approach angle is indicated in the section entitled
"Technical data"!
m
Check the fill level of the operating substances so that these do not escape when driv-
ing on an incline.
m
Attachment and loading equipment must meet the conditions of the applicable acci-
dent prevention regulations!
m
The weight of the paver finisher must be taken into consideration when selecting the
attachment and loading equipment!
2.1 Preparations
- Prepare the paver finisher for transportation (see chapter D).
- Remove all overlaying or loose parts from finisher and screed (see also Screed op-
erating instructions). Store these parts in a safe place.
m
Move the auger to the uppermost position to avoid collisions!
f
When screed is operated with the optional gas heat-
ing system:
- Remove the gas bottles for the screed heating system:
- Close the main shut-off valves and the bottle valves.
- Turn off the valves on the bottles and remove the gas
bottles from the screed.
- Transport the gas bottles on a second vehicle; heed all applicable
safety regulations.