58 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725—Rev 15
Figure 28. Section Joining (Three UPM Section Shown)
Left Top Panel
Wireway Panel
Left Middle Panel
Corner Channel
UPM Section
Interior Left
Side Panel
5. Remove the screws securing the left top panel and remove the panel (see Figure 28). Retain the hardware
for later use.
6. Remove the screws securing the left middle panel and remove the panel (see Figure 28). Retain the
hardware for later use.
Use care during installation to protect components mounted on the right side of the ISBM section and the
intercabinet wiring harnesses attached to the left side UPM section from damage.
NOTE Clearance between the ISBM and the UPM sections must be less than 1/2" so that
joining brackets can be installed.
7. Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side of
the previously installed UPM section. Verify that the ISBM section right side is against the UPM section
left side and the front of the cabinet bases are flush with each other (see Figure 29).