INSTALLATION
EATON Powerware
®
9125 Two-in-One UPS (700–2000 VA) User’s Guide S 164201514 Rev B www.powerware.com
24
7. Remove the adjacent corner screws from the rear panels as shown
in Figure 10 to install the joining brackets. Discard the screws.
8. Align each joining bracket with the screw holes and secure with the
screws provided in the accessory kit.
9. If installing additional EBMs, repeat Steps 7 and 8 for each cabinet.
10. Continue to the following section, “Installing the UPS,” to complete
the installation.
Joining Bracket
Joining Bracket
EBM UPS
Figure 10. Installing the Joining Brackets