INSTALLATION
EATON Powerware
®
9125 Two-in-One UPS (700–2000 VA) User’s Guide S 164201514 Rev B www.powerware.com
26
5. If an emergency power-off (disconnect) switch is required by local
codes, see the following section, “Remote Emergency Power-off
Installation,” to install the REPO switch before powering on the
UPS.
6. For 230V models only. Plug the detachable UPS power cord into the
input connector on the UPS rear panel.
7. Plug the UPS power cord into a power outlet.
All front panel indicators flash briefly and the UPS conducts a
self-test. When the self-test is complete, t he
μ
indicator flashes,
indicating the UPS is in Standby mode with the equipment offline. If
the
or indicator flashes, see page 59.
Site Wiring Fault
Indicator
Battery Service
Indicator
Figure 12. Fault Indicators
8. Press the On button.
The
μ
indicator illuminates solid and the bar graph indicators
display the percentage of load being applied to the UPS. The UPS is
now in Normal mode and supplying power to your equipment.
To change the factory-set defaults, see “Configuration” on page 37.
NOTE The batteries charge to 80% capacity in approximately 2 hours. However, it is
recommended that the batteries charge for 36 hours after installation or long-term storage.
NOTE If you installed power management software and optional EBMs, ensure maximum
battery runtime by using the ERM configurator tool on the Software Suite CD and connecting
a minimum load of 10% (15% recommended) to the UPS.