5.4 First Flight Checkout:
Prepare the aircraft for flight. Fly the aircraft in the pattern. Check for proper operation of each function displayed on
the MVP. Land the aircraft and perform the following checks as soon as possible:
A. Check all fittings, hoses and transducers for leaks.
B. Check all fittings, hoses, wires, system components and hardware to be secure and are not chafing.
C. Check for interference to any controls.
D. Check for any unsafe condition.
Do not release the aircraft for normal operation until all steps in this document have been performed and the aircraft is
safe to fly.
5.5 Read the "Warranty/Agreement" and the "Important Notice":
Require the pilot to read the "Warranty/Agreement" and the "Important Notice" located in the front of the "Operating
Instructions" before releasing the aircraft for flight.
5.6 POH/AFM Supplement:
The "MVP-50T Primary Engine Monitor FAA-Approved POH/AFM Supplement No. 06271101, Rev. IR" document
(or later FAA approved revision) must be completed and inserted into the Airplane Flight Manual. If you need
additional copies of the supplement please contact Electronics International at (541) 318-6060 or www.buy-ei.com.
40