FB1100 Flow Computer Instruction Manual
D301752X012
November 2023
32 Installation
2.11.2 Connecting Battery Power
EXPLOSION HAZARD: Ensure the area in which you perform this operation is non-
hazardous. Performing this operation in a hazardous area could result in an explosion.
Important
If you purchased this device with the rechargeable lead acid battery pack, be aware that
the lead acid battery pack must always be stored in a charged state. If you do not intend to
install the flow computer immediately, make provisions to “top-off” the lead acid battery at
six-month intervals. Failure to do so could sharply reduce battery life or result in a dead
battery.
When power comes from an internal battery pack, the battery pack plugs into one of two
connectors.
Figure 2-19. Connecting the Battery Pack
Restriction
The solar panel and lead acid battery combination cannot be used with ATEX/IECEx
applications.