EasyManua.ls Logo

Emerson FB2100 - Page 63

Emerson FB2100
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FB2100 Flow Computer Instruction Manual
D301783X012
November 2023
Installation 49
Figure 2-36. Removing Fork Connectors
4. Remove the junction box cover. Use a utility knife to remove the knock-outs (Item 2)
in the junction box (Item 1) and feed the wires from the solar controller into the
junction box, and through the solar controller lock nut (Item 3).
Figure 2-37. Wiring Solar Power – External Regulator
1
Junction box
2
Knock-outs
3
Lock nut
5. Use the solar controller lock nut to attach the solar controller to the junction box,
and use a 7/32ā€ flat head screwdriver to attach the wires from the controller to the
junction box connectors as shown.

Table of Contents

Other manuals for Emerson FB2100

Related product manuals