Commissioning Levelflex M FMP41C with HART/4...20 mA
38 Endress + Hauser
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist “Post-installation check” (→ ä 21).
• Checklist “Post-connection check” (→ ä 21).
6.2 Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear on the display:
⇒
⇓
After 5 s, the following message appears
⇓
After 5 s, the following message appears (e.g. on HART
devices)
⇓
After 5 s or after you have pressed
F
the following
message appears
Select the language
(this message appears the first time the instrument is
switched on)
⇓
Select the basic unit
(this message appears the first time the instrument is
switched on)
⇓
The current measured value is displayed
⇓
After
F
is pressed, you reach the group selection.
This selection enables you to perform the basic setup