Commissioning (installation and configuration) Micropilot FMR62
12 Endress+Hauser
‣
Personnel must be authorized by the plant owner/operator.
‣
Be familiar with federal/national regulations.
‣
Before starting work: personnel must read and understand the instructions in the
manual and supplementary documentation as well as the certificates (depending on
the application).
‣
Personnel must follow instructions and comply with general policies.
The operating personnel must fulfill the following requirements:
‣
Personnel are instructed and authorized according to the requirements of the task by
the facility's owner-operator.
‣
Personnel follow the instructions in this manual.
4.2 Installation
The mounting and wiring of the device and the permitted orientations are described in the
Operating Instructions pertaining to the device.
Correct installation is a prerequisite for safe operation of the device.
4.3 Commissioning
The commissioning of the device is described in the Operating Instructions pertaining to
the device.
Prior to operating the device in a safety instrumented system, verification must be
performed by carrying out a test sequence as described in Section 6 Proof testing.
4.4 Operation
The operation of the device is described in the Operating Instructions pertaining to the
device.
4.5 Device configuration for safety-related applications
4.5.1 Calibration of the measuring point
For more information, see the Operating Instructions.
Check the initial factory setting of the E (zero point) and F (range) parameters according
to the desired measuring range and correct if necessary.
4.5.2 Configuration methods
When using the devices in process control safety systems, the device configuration must
meet two requirements:
• Confirmation concept:
Proven, independent testing of safety-related parameters entered.
• Locking concept:
Locking of the device following parameter configuration (according to IEC 61511-1 :
2016 Section 11.6.3).
To activate the SIL mode, the device must run through an operating sequence, during
which the device can be operated by means of the device display or any asset management
tool (FieldCare, Pactware, AMS, PDM, Field Communicator 375/475, ...) for which
integration is available.