Division:
59 I 77
Maintenance intervals
Interval Action Carried out by
starting work
Damage to the casing
Damage to the base plate
Damage to the ventilation hoses
Checking the arm bar
Operating display on the filter housing
completion of
work
Cleaning or decontamination of at least the front third of the
base plate as well as the inside of the front flap.
Visual inspection of the:
Electrical connections on the alarm system
Connections of the ventilation hose on the ST1 safety
weighing enclosure and filter housing
Cable cover plates
Screws on the air-collecting chamber
Fastening of the waste system
Functional test
Alarm function (sensor test)
Smoke test (flow visualisation) on the ST1 safety weighing
enclosure and in the environment
Basic cleaning
Basic cleaning of the interior of the ST1 safety weighing
enclosure excluding the rear wall
Basic cleaning before annual maintenance
Basic cleaning of the interior of the ST1 safety weighing
enclosure including rear wall
Functional tests according to SOP: Q ST1XXSOPG
Checking the inflow velocity
Checking and calibrating the alarm system
Checking the retention rate of the filter (DOP test)
envirosciences