EasyManua.ls Logo

Epson Stylus Pro 4900 - Page 168

Epson Stylus Pro 4900
441 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Epson Stylus Pro 4900/Epson Stylus Pro 4910 Revision A
DISASSEMBLY & ASSEMBLY Disassembly and Assembly Procedure 169
Confidential
9. Remove the two screws that secure the CR Motor.
A) Silver, Phillips, Round Washer Head S-tite M3x5: two pieces
10. Move the CR Motor to the rear, and detach the CR Belt from the pinion gear.
11. Remove the CR Motor.
Figure 3-79. Removing the CR Motor
C A U T I O N
When removing the CR Motor in the next step, be careful not to
damage the scale of the APG motor.
A D J U S T M E N T
R E Q U I R E D
Be sure to refer to Chapter 4 “Adjustment” (see p277) and perform
specified adjustments after replacing or removing the CR Motor.
<Adjustment items>
1. Counter Reset (CR Motor Counter)
2. CR Belt Adjustment
3. Motor Measurement Adjustment
4. CR Speed Initialize
5. Active Damper Adjustment
6. Nozzle Check
7. Auto Bi-D Adjustment
8. PW + T&B&S Check & Adjustment
A
A
CR Motor
CN204
Saddle
CR Belt
Pinion gear

Table of Contents

Other manuals for Epson Stylus Pro 4900

Related product manuals