Product Specification for Power and Battery Cabinet
Fault Localization
In the PBC all active subunits are identified and the address of faulty
subunit is stored in a flash memory. This makes it possible for the
repair center to perform a fast and accurate repair on the PBC without
any calibration.
6.7.12 Installation
A quick and easy installation procedure is provided. If the installation
preconditions are met, the PBC can be installed in less than 30 minutes.
A minimum of tools and instruments are required when installing a
PBC.
Installation Scenario
To support the concept of a quick and smooth installation scenario, the
PBC installation work can be divided in to two steps:
• Preinstallation. Installation of the Mounting Base, antennas and
all necessary cabling ( AC mains and alarms).
• Installation and Commissioning. Installation of the Cabinet
including all parts according to customer ordering.
However, it is possible to perform the installation in one site visit.
The manual operations at installation are few and easy. This is valid
also when connecting external cables.
Site Installation Requirement
500 mm
P003438A
Figure 31 Wall Mounting side by side
Free space is required around the PBC for installation and maintenance.
For a simple installation, the following distances are recommended:
• Front: 1.0 m
• Side: 0.5 m
• Top: 0.5 m
• Bottom: 0.5 m