EasyManua.ls Logo

Evinrude E-TEC E50DPLSCB - Page 224

Evinrude E-TEC E50DPLSCB
369 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
222
POWERHEAD
POWERHEAD ASSEMBLY
When the crankcase is seated, install and firmly
seat the crankcase taper pin.
Tighten main bearing nuts in stages to a final
torque of:
26 to 30 ft. lbs. (35 to 41 N·m).
Start in the center and work outward in a spiral
pattern.
Apply Nut Lock to crankcase flange screws. Install
crankcase flange screws and tighten to a torque
of 60 to 84 in. lbs. (7 to 9.5 N·m).
Test that the crankshaft spins freely without bind-
ing.
IMPORTANT: After powerhead has been
assembled, allow at least two hours for Gel-Seal II
to cure before running outboard.
Apply Gasket Sealing Compound to both sides of
a new water cover gasket. Position gasket and
cover on cylinder block.
Apply Nut Lock to cover screws. Position J-
clamps as shown. Tighten all screws to a torque of
60 to 84 in. lbs. (7 to 9.5 N·m).
002260
002254
002259
1. J-clamps 002242
1
1

Table of Contents

Related product manuals