EasyManua.ls Logo

Evo HW 79 - Table of Contents

Evo HW 79
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34000 Autry Street, Livonia, MI 48150 • 800.968.5530 • Fax 734.419.0209 • www.hamiltonengineering.com • LIT91127 REV 3/09
TABLE OF CONTENTS
TABLE OF CONTENTS
Part 6 . . . . . . . . . . . . . . . . . . . 23-25
START UP PROCEDURES
A Items to be checked before
lighting the EVO 23
B Lighting Instructions 23-24
C Operating Instructions 24
D Adjusting the Temperature
on the EVO Display 24
E Sequence of Operation 24-25
Part 7 . . . . . . . . . . . . . . . . . . . 25-32
SERVICING
A Servicing the EVO 25
B Placing EVO into Normal Operation 25
C Soft Lockout Codes 26
D Hard Lockout Codes 26-27
E Fault Causes 28-31
F To Turn Off Gas to Appliance 31
G Pump & Wiring Control 31
H Temperature Sensor Reading
Instructions 32
I EVO Sensor Resistance Table 32
Part 8 . . . . . . . . . . . . . . . . . . . 33-48
MAINTENANCE & SPEC. INSTALLATION REQ.
A Maintenance Procedures 33
B Annual Inspection 33
C Condensate Cleaning Instructions 34
D Combustion Chamber
Coil Cleaning Instructions 34-35
E EVO Controls 35-36
F Installation at High Altitudes 36
G Coil Scaling Prevention Feature
(E-6 error codes) 36
H Water Heater Operating Sample 37
I EVO MICRO Parts Breakdown 38-39
J EVO DUO Parts Breakdown 40-41
K Wiring Diagrams 42-47
L Installation Requirements
(Massachusetts) 48
Part 1 . . . . . . . . . . . . . . . . . . . . . 4–7
GENERAL INFORMATION
A How It Operates 4
B EVO Dimensions 5-6
C Pre-installation Requirements 6-7
D Pressure Relief Valve 7
Part 2 . . . . . . . . . . . . . . . . . . . . . 8-9
ELECTRICAL
A Electrical Connection 8
B Internal Wiring Connection 8-9
Part 3 . . . . . . . . . . . . . . . . . . . 10–14
GAS CONNECTION
A Gas Connection 10
B Gas Piping 10
C Gas Tables 11
D Gas Valve Set Up 11-12
E Setting Maximum Load 12-13
F Setting Minimum Load 13
G Gas Conversion 13
H Gas Valve Replacement 14
Part 4 . . . . . . . . . . . . . . . . . . . 14-20
VENTING
A Approved Venting Materials 14-15
B Venting the EVO 15-18
C Inlet Air Vent 19
D Venting Runs Exceeding Maximum
Combined Length 19
E Heater Removal from a
Common Vent System 19-20
F Condensate Requirements 20
Part 5 . . . . . . . . . . . . . . . . . . . 20-22
PIPING
A Hydronic Heating Boiler Piping 20-21
B Fill & Purge Heating System 21
C Removing Air from Heat Exchanger
21
D Water Heating Piping 22
Page 3 of 50

Table of Contents