14
13
B614 20 732998 - Rev.A_DRAFT
1
2
4
1
1
2
3
Translation of the original instructions
ENGLISH
FIXING THE CABLES INSIDE THE BARRIER
130 cm of cable are necessary.
1. (13) Arrange the cables inside the barrier. Fix
the cables with the cable ties provided 1, 2 and 3.
2. (14) Remove bolt with washer 1. Open cable
tie2. Bring the cables to the board.
3. Use the screw and washer 1 to close the cable tie.
The electrical connections must be made after completing
the mechanical installation