9. PUTTING INTO SERVICE
9.1 FINAL CHECKS
1. If foot traffic cannot be excluded, check that the
forces generated by the beam fall within the limits
permitted by the standard. Use an impact force
tester in accordance with standards EN 12453
and EN 12445. For non-EU countries, of there
are no specific local regulations, the force must
be less than 150 N. Check that the maximum
force required to move the beam by hand is less
than 220 N.
2. Check the automation system is working properly
with all the devices installed.
9.2 FINAL OPERATIONS
1. Fit the upper cover (see the relative section).
2. (43) Apply the notice supplied warning against
the risk of cutting, crushing or the loss of fingers
or a hand between the beam and the body of the
barrier.
!
The indication of the RISK must be visible even with the
beam closed.
3. Highlight all areas with adequate warning signs
in which there are still residual risks, even if all
possible safety measures having been adopted.
4. Exhibit the sign prohibiting foot traffic.
5. Place the "DANGER - AUTOMATIC MOVEMENT" sign
where it is clearly visible. Place the EC marking
on the barrier.
!
Use adhesive signs so as not to perforate the box.
6. Fill out the EC declaration of conformity and the
system register.
7. Give the EC Declaration, the system register with
the maintenance plan and the instructions for use
of the automation system to the system owner/
operator.