EasyManua.ls Logo

Faraone ZP8 - Page 57

Faraone ZP8
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USE AND MAINTENANCE MANUAL - SECTION 4
AERIAL PLATFORM ZP – Rev. 05_2018
Page 4-20
Loading via the loading system supplied (optional)
The machine can be loaded by means of the provided forklift, supplied upon
request.
Phase 1 Move the machine close to the edge of the truck.
Phase 2 Using the two spring pins, position the support trolley at
about 10 cm. From the height of the truck's loading bed. Check that the two
spring pins that lock the trolley are correctly hooked when overturning.

Table of Contents