Phase 5 During overturning, check that the two tilting blocks are
released from the support trolley.
Phase 6 When the platform is in the horizontal position, push it on the
bed until it touches the back and pull back the overturning lever under the
base carriage.
ATTENTION
SECURE THE MACHINE SO THAT IT DOES NOT GET DAMAGED DURING
TRANSPORT.