C 11 16
6 Transportation
m
Reduce the paver finisher and the screed to their basic widths; also remove any at-
tached side plates.
6.1 Preparations
- Prepare the paver finisher for transportation (see chapter D).
- Remove all overlaying or loose parts from finisher and screed (see also Screed op-
erating instructions). Store these parts in a safe place.
f
When screed is operated with the optional
gas heating system:
- Remove the gas bottles for the screed heating system:
- Close main shut-off valves and bottle valves.
- Turn off the valves on the bottles and remove the gas
bottles from the screed.
- Transport the gas bottles on a second vehicle; heed all applicable safety regulations.